होम उत्पादनिर्माण उपकरण स्पेयर पार्ट्स

Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction

प्रमाणन
अच्छी गुणवत्ता हाइड्रोलिक क्रॉलर खुदाई बिक्री के लिए
अच्छी गुणवत्ता हाइड्रोलिक क्रॉलर खुदाई बिक्री के लिए
Thanks for all your cooperation, the more orders, the better service.....

—— Johnny Benson

Yesterday, we cooperated and trusted each, tomorrow, we share the same breath for win-win. My friend, thank you.

—— Charles Soludo

Since We choose your factory and trucks, we are in good way!

—— HADJADJ EL-HASSEN

Nous sommes une entreprise en Togo, nous avons bien collaboré avec SINOTRUK KOGEL depuis 7 ans. Grace à son support, nous possèdons un très bon marché

—— Dinga

मैं अब ऑनलाइन चैट कर रहा हूँ

Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction

चीन Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction आपूर्तिकर्ता
Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction आपूर्तिकर्ता Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction आपूर्तिकर्ता

बड़ी छवि :  Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction

उत्पाद विवरण:

Place of Origin: China
ब्रांड नाम: XGMA
प्रमाणन: ISO 9001:2008
Model Number: Earth Pressure Balance(EPB)TBM

भुगतान & नौवहन नियमों:

Minimum Order Quantity: 1
मूल्य: Negotiable
Packaging Details: Seaworthy packing will comply with international standards, which is suitable for sea transportation and land transportation
Delivery Time: 18 months after receiving advanced payment
विस्तृत उत्पाद विवरण
हाई लाइट:

construction equipment parts

,

heavy equipment parts

Description:

 

Earth Pressure Balance(EPB)TBM

When an EPB TBM bores, its cutter head in front rotates to excavate the soil into the muck chamber. When the chamber is full of mucks, its passive earth pressure is basically the same as the earth and water pressure exerted on the cutting face; resultantly, the balance of the face is realized and maintained (i.e. the faceis dynamically stable).

 

 

Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction

 

Earth Pressure Balance Applied to the hard and soft staggered formation tunnel construction

 

 

 

 

 

 

 

 

 

 

 

 

 

सम्पर्क करने का विवरण
Shandong Sinomtp Construction Equipment Company Limited

व्यक्ति से संपर्क करें: libaiyan

हम करने के लिए सीधे अपनी जांच भेजें (0 / 3000)